Lane Closure

­Traffic Impacts for the Week of 09/23/2024 for the Phase 5 North, Phase 6 North, Phase 7 North, Phase 2 South, Phase 3 South, Phase 4 South, Phase 5 South, and the Phase 6 South Projects

PHASE 5 NORTH

Horizontal Directional Drilling / Undergrounding

Private Side Service Conversions – Various Locations – No Traffic Impacts – Traffic Maintained

PHASE 6 NORTH

Horizontal Directional Drilling / Undergrounding

Private Side Conversions – Various Locations – No Traffic Impacts – Traffic Maintained

ATT Conduit Repairs – Various Locations – No Traffic Impacts

PHASE 7 NORTH

Horizontal Directional Drilling / Undergrounding

HDD – Via Marila – North Ocean To Northlake Way – “Road Closed” Local Traffic Only – Traffic Maintained

HDD – North Alley (South of Garden Road) – Northlake Way to North Ocean – “Road Closed” Local Traffic Only – Traffic Maintained

Equipment & Conduit Installation – Northlake Way From Via Marila To Bahama – Lane Closure To Be Implemented – Traffic Maintained

Wire Pulling – Sandpiper & Tradewinds Between Northlake Way & North Ocean –  “Road Closed” Local Traffic Only – Traffic Maintained

PHASE 2 SOUTH 

Replacement of ATT Hand Hole Lids – Various Locations – No Traffic Impacts

PHASE 3 SOUTH 

Horizontal Directional Drilling / Undergrounding

Continue conversions and remaining switching orders as they are released by FPL.

Continue Remaining Prep Work On Golfview Alley

PHASE 4 SOUTH

Horizontal Directional Drilling / Undergrounding

Terminations Throughout The Phase. Switching Orders As They Are Released By FPL.

Miscellaneous Sidewalk & Curb Installation Throughout The Phase

PHASE 5 SOUTH

Horizontal Directional Drilling / Undergrounding

Switching orders as they are released by FPL. Continue conversions as allowable.

PHASE 6 SOUTH

Horizontal Directional Drilling / Undergrounding

HDD – North Side of Chapel Hill / South Side of Flagler Museum

Cable Pulling Throughout The Phase – Working South To North – Coordinating With Breakers On S. County.

Conduit connections, equipment installation, and road restoration on Royal Poinciana Way From Cocoanut Row To South County Road. Cocoanut Row From Seabreeze to White Hall. Breakers Golf Course at South County & Main Street, Pendelton from South Lake Trail To South Ocean and miscellaneous locations on Primavera & Antigua Lane.  

MH repair work at Cocoanut & Primavera (Date To Be Scheduled With FPL)

“LOCAL TRAFFIC ONLY” 

**All Phases Subject to Change**