Town of Palm Beach – Phase 5 Undergrounding of Utilities Design – FPL Meter Locates
Who: Project Engineering Representative
What: Electric meter reviews
When: March 11 – April 19, 2019
Where: On-Site visit outside your home. (You are not required to be present for the inspection.)
Why: To document the location of your electric meter. (Only FPL is allowed to open your electric meter box.)
Dear Palm Beach Resident:
The Town of Palm Beach has initiated design for Phase 5 of the Undergrounding Utilities project. Phase 5 is divided into two sub-phases: Phase 5 North consists of properties between Country Club Road south to Southland Road. Phase 5 South consists of properties properties between South Lake Drive and Hibiscus Avenue, from Peruvian Avenue to Royal Palm Way, and the properties between the Intracoastal Waterway and the Atlantic Ocean, from Royal Palm Way to Seaspray Avenue.
It is important to the design effort to know the location of your electric meter on your home or business. The Town of Palm Beach will be sending project-engineering representatives to document the location of your electric meter. The reviews are scheduled to be performed between March 11 and April 19, 2019. The activity will be brief and non-intrusive. No excavation, disturbances to landscape or hardscape are performed and you are not required to be present during the review.
Additionally, we are requesting property owners in Phase 5 provide Town staff with contact information permitting us to deliver project updates via email and discuss utility placements, if necessary, with you or your authorized designee. Please send an email to underground@townofpalmbeach.com or call 561-227-7077 to provide your contact information.
If you have any questions, please do not hesitate to contact us using the above email or phone number.
Thank you,
Steven N. Stern
Underground Utilities Project Manager