Traffic Impacts for the Week of 04/01/2024 for the Phase 4 North, Phase 5 North, Phase 6 North, Phase 7 North, Phase 3 South, Phase 4 South, Phase 5 South, and the Phase 6 South Projects
PHASE 4 NORTH
FPL – Pole Removal Via Crane on Colonial (First Part of Week) – “Road Closed Local Traffic Only”
FPL – Pole Removal Via Crane on Queens Lane (Latter Part of Week) – “Road Closed Local Traffic Only”
PHASE 5 NORTH
Horizontal Directional Drilling / Undergrounding
HDD (COMCAST) – Northlake Way Between Cherry Lane & West Indies Drive – Lane Closure To Be Implemented – Traffic Maintained
HDD (COMCAST) – Northlake Way Between West Indies Drive & Via Linda – Lane Closure To Be Implemented – Traffic Maintained
Concrete Curb Installation – Northlake Way – Various Locations – Lane Closure To Be Implemented – Traffic Maintained
North Ocean – Palm Beach County Club Parking Area – Section of South End of Parking Area Along the West Side of North Ocean To Be Blocked Off To Complete Switch Terminations – Pending FPL Switching Orders
PHASE 6 NORTH
Horizontal Directional Drilling / Undergrounding
Wire Pulling & Terminations – Various Locations – No Traffic Impacts – Traffic Maintained
PHASE 7 NORTH
Horizontal Directional Drilling / Undergrounding
HDD – Alley Between Sandpiper & Eden From Northlake Way To North Ocean – “Road Closed” – No Through Traffic
HDD – Jamaica Lane Between Northlake Way & North Ocean – “Road Closed Local Traffic Only” – Traffic Maintained
Equipment & Conduit Installation – Northlake Way Between The Alley & Tradewinds – Lane Closure To Be Implemented – Traffic Maintained
Equipment & Conduit Installation – Jamaica Lane Between Northlake Way & North Ocean Blvd. – “Road Closed Local Traffic Only” – Traffic Maintained
Wire Pulling (Secondary) – Bahama Lane – No Traffic Impacts
PHASE 3 SOUTH
Horizontal Directional Drilling / Undergrounding
Continue conversions and remaining switching orders as they are released by FPL.
HDD – Island Drive – (FPL Work)
PHASE 4 SOUTH
Horizontal Directional Drilling / Undergrounding
Cable Installation Throughout The Phase
Device Installation and Terminations Throughout The Phase
PHASE 5 SOUTH
Horizontal Directional Drilling / Undergrounding
Switching orders as they are released by FPL. Continue conversions as allowable.
Sidewalk restorations on Cocoanut Row and Seaview Avenue.
PHASE 6 SOUTH
Horizontal Directional Drilling / Undergrounding
Conduit connections, equipment installation, and road restorations on Seabreeze Avenue between South County Road and the intracoastal and in the Clarke Alleyway from South County Road to South Ocean Boulevard.
“LOCAL TRAFFIC ONLY” **All Phases Subject to Change**