Traffic Impacts for the Week of 05/22/2023 for the Phase 4 North, Phase 5 North, Phase 6 North, Phase 3 South, Phase 4 South, and the Phase 5 South Projects
PHASE 4 NORTH
Horizontal Directional Drilling / Undergrounding
Private Side Service Connections — Various Locations (Dependent on FPL Switching Orders) – Traffic Maintained
Transformer Swap Out – Near 1144 North Ocean – Lane Closure To Be Implemented – Traffic Maintained
PHASE 5 NORTH
Horizontal Directional Drilling / Undergrounding
Wire Pulling – Primary & Secondary – Various Locations – No Traffic Impacts
Wire Terminations In Various Transformers & Switches – Various Locations – No Traffic Impacts
PHASE 6 NORTH
Horizontal Directional Drilling / Undergrounding
HDD – N. Lake Way Between Via Tortuga & South Woods Road – Lane Closure To Be Implemented – Traffic Maintained
HDD – Tangier From N. Lake Way To The First Transformer East Of The Intersection-Road Closed local traffic only- Traffic Maintained.
Equipment & Conduit Installation – N. Lake Way Between Via Tortuga & South Woods Road– Lane Closure To Be Implemented – Traffic Maintained
PHASE 2 SOUTH
Horizontal Directional Drilling / Undergrounding
Switching orders on South Ocean Boulevard between Via Del Lago and Via Bellaria. (wreck out vault room)
Continue to wreck out on Algoma Road and South Ocean Boulevard from Southern Boulevard south to project limits.
Switching orders on Vita Serena to connect PH2S and PH3S.
PHASE 3 SOUTH
Horizontal Directional Drilling / Undergrounding
Miscellaneous equipment verification and switching orders – Various Locations
PHASE 4 SOUTH
Horizontal Directional Drilling / Undergrounding
HDD services in the 100 & 200 blocks of Brazilian Avenue.
HDD on Australian Avenue between South Ocean Boulevard and Hibiscus Avenue.
HDD on Brazilian Avenue between South Ocean Boulevard and Hibiscus Avenue.
HDD on South County Road between Chilean Avenue and Royal Palm Way.
PHASE 5 SOUTH
Horizontal Directional Drilling / Undergrounding
HDD on Royal Palm Way in rear easements on the 300 block (lane shifts may be required for equipment staging.)
Conduit connections, equipment installation, and road restorations on Cocoanut Row between Seabreeze Avenue and Royal Palm Way and on Seaspray Avenue between Cocoanut Row and South County Road.