PHASE 4 NORTH
Horizontal Directional Drilling / Undergrounding
Awaiting FPL Pole Removal Schedule
PHASE 5 NORTH
Horizontal Directional Drilling / Undergrounding
HDD – Palm Beach Country Club Tunnel Crossing – North Ocean Blvd. – Lane Shift To Be Implemented -Traffic Maintained
Pulling Feeder & Primary – N. County Road From Country Club Road To Plantation – Lane Closure To Be Implemented – Traffic Maintained
PHASE 6 NORTH
Horizontal Directional Drilling / Undergrounding
HDD – N. County Road Between Bermuda & Sanford – Lane Closure To Be Implemented – Traffic Maintained
HDD – Miraflores Between Northlake Way & N. County Road – “Road Closed” Local Traffic Only – Traffic Maintained.
Equipment & Conduit Installation – Tangiers – “Road Closed” Local Traffic Only – Traffic Maintained.
PHASE 2 SOUTH
Horizontal Directional Drilling / Undergrounding
Pole removal north of Southern Boulevard. Lane shifts and flagging as necessary.
PHASE 3 SOUTH
Horizontal Directional Drilling / Undergrounding
Miscellaneous renumbering and loop switching orders.
PHASE 4 SOUTH
Horizontal Directional Drilling / Undergrounding
Miscellaneous cable pulling within the project limits.
PHASE 5 SOUTH
Horizontal Directional Drilling / Undergrounding
Conduit connections, equipment installation, and road restorations on Cocoanut Row between Brazilian Avenue and Seaview Avenue, on Royal Palm Way between South Lake Drive and Hibiscus Avenue, and on South County Road between Royal Palm Way and Seabreeze Avenue.
Miscellaneous cable pulling in the project limits
PHASE 6 SOUTH
Horizontal Directional Drilling / Undergrounding
HDD Clarke/Barton Alleyways between Cocoanut Row and South Ocean Boulevard.
HDD services on Seabreeze Avenue.