PHASE 5 NORTH

Horizontal Directional Drilling / Undergrounding

Private Side Service Conversions – Various Locations –  No Traffic Impacts – Traffic Maintained

PHASE 6 NORTH

Horizontal Directional Drilling / Undergrounding

Private Side Conversions – Various Locations – No Traffic Impacts – Traffic Maintained

ATT Conduit Repairs – Various Locations – No Traffic Impacts

PHASE 7 NORTH

Horizontal Directional Drilling / Undergrounding

HDD – Sandpiper Drive – North Ocean Blvd. To Northlake Way – “Road Closed” Local Traffic Only – Traffic Maintained

HDD – N. Lake Trail between the “CUT” and Bahama Lane – Lane Closure To Be Implemented – Traffic Maintained

Equipment & Conduit Installation – Northlake Way From Tradewinds To Via Marila – Lane Closure To Be Implemented – Traffic Maintained

Equipment & Conduit Installation – Sandpiper Between Northlake Way & North Ocean Blvd. – “Road Closed” Local Traffic Only – Traffic Maintained 

PHASE 2 SOUTH 

Replacement of ATT Hand Hole Lids – Various Locations – No Traffic Impacts

PHASE 3 SOUTH 

Horizontal Directional Drilling / Undergrounding

Continue conversions and remaining switching orders as they are released by FPL.

Continue Prep Work On Golfview Alley

PHASE 4 SOUTH

Horizontal Directional Drilling / Undergrounding

Terminations Throughout The Phase. Switching Orders As They Are Released By FPL.

Miscellaneous Sidewalk & Curb Installation Throughout The Phase

PHASE 5 SOUTH

Horizontal Directional Drilling / Undergrounding

Switching orders as they are released by FPL. Continue conversions as allowable.

PHASE 6 SOUTH

Horizontal Directional Drilling / Undergrounding

HDD – Royal Poinciana and Cocoanut/Bradley Place

Cable Pulling Throughout The Phase – Working South To North – Coordinating With Breakers On S. County.

Conduit connections, equipment installation, and road restoration on Royal Poinciana Way From Cocoanut Row To South County Road. Cocoanut Row From Seabreeze to White Hall. Breakers Golf Course at South County & Main Street, Pendelton from South Lake Trail To South Ocean and miscellaneous locations on Primavera & Antigua Lane.  

“LOCAL TRAFFIC ONLY” 