PHASE 4 NORTH   

Horizontal Directional Drilling / Undergrounding

Awaiting FPL Pole Removal 

PHASE 5 NORTH  

Horizontal Directional Drilling / Undergrounding

HDD – Via Linda from N. Lake WAY (West) To The Cul De Sac – “Road Closed” Local Traffic Only-Traffic Maintained.

Wire Pulling – Primary & Secondary – Various Locations – Lane Closure – Traffic Maintained

Wire Terminations (Feeder & Primary) – Various Locations – Lane Closure – Traffic Maintained

PHASE 6 NORTH

Horizontal Directional Drilling / Undergrounding

HDD –  N. County Road Between Sanford & Miraflores  – Lane Closure To Be Implemented – Traffic Maintained

Pulling Feeder – North County Road Between Southwoods Road & Phipps Estate – Lane Closure To Be Implemented – Traffic Maintained

Equipment & Conduit Installation – Tangiers Ave. Between Northlake Way & North County Road – “Road Closed” Local Traffic Only – Traffic Maintained.

Wire Terminations (Feeder & Primary) – Various Locations – Lane Closure To Be Implemented – Traffic Maintained

PHASE 2 SOUTH

Horizontal Directional Drilling / Undergrounding

Pole Removal South of Southern Boulevard, on Clarendon Avenue and on Via Palma.

PHASE 3 SOUTH 

Horizontal Directional Drilling / Undergrounding

Miscellaneous loop switching orders. Continue conversions in the southern half of the project limits.

PHASE 4 SOUTH

Horizontal Directional Drilling / Undergrounding

Conduit connections, equipment installation, and road restorations on Hibiscus Avenue between Brazilian Avenue and Royal Palm Way.

PHASE 5 SOUTH

Horizontal Directional Drilling / Undergrounding

Conduit connections, equipment installation, and road restorations on Royal Palm Way between Cocoanut Row and South County Road, and on South County Road between Royal Palm Way and Seabreeze Avenue.

Miscellaneous cable pulling in the project limits

PHASE 6 SOUTH

Horizontal Directional Drilling / Undergrounding

HDD Barton Alleyways between Cocoanut Row and South Ocean Boulevard.

HDD services on Seabreeze Avenue.