Traffic Impacts for the Week of 11/13/2023 for the Phase 5 North, Phase 6 North, Phase 2 South, Phase 3 South, Phase 4 South, Phase 5 South and the Phase 6 South Projects
PHASE 5 NORTH
Horizontal Directional Drilling / Undergrounding
Equipment & Conduit installation – N. Lake Way between Ridgeview & Via Linda – Lane closure to be implemented – Traffic Maintained.
Equipment & Conduit installation – West Side of Via Linda between the cul-de-sac & N. Lake Way – “Road Closed” Local Traffic Only – Traffic Maintained
Conduit & Equipment Installation – W. Indies between N. Lake Way & N. County Road – “Road Closed” Local Traffic Only – Traffic Maintained.
Pulling Wire & Terminations – Various Locations – No Traffic Impacts
PHASE 6 NORTH
Horizontal Directional Drilling / Undergrounding
HDD – Miraflores Between Northlake Way & North County Road – Road Closed – Local Traffic Only – Traffic Maintained
HDD (Services) – Casa Bendita between N. County Road (East) to the cold-a-sac – “Road Closed” Local Traffic Only – Traffic Maintained
Equipment & Conduit Installation – Miraflores Between Northlake Way & N. County Road – Road Closed – Local TrafficOnly – Traffic Maintained
Equipment & Conduit Installation – Casa Bendita Between N. County Road and the cul-de-sac. Road Closed – Local TrafficOnly – Traffic Maintained
Wire Pulling & Terminations – Various Locations – No Traffic Impacts
PHASE 2 SOUTH
Horizontal Directional Drilling / Undergrounding
Pole Removal / Punch List. On Vita Serena
PHASE 3 SOUTH
Horizontal Directional Drilling / Undergrounding
Continue conversions, switching orders, and misc. punch list items.
PHASE 4 SOUTH
Horizontal Directional Drilling / Undergrounding
Conduit connections, equipment installation, and road restorations on Brazilian Avenue between Hibiscus Avenue and South Ocean Boulevard and Australian Avenue between Hibiscus Avenue and South Ocean Boulevard.
Miscellaneous cable, device installation work on Cocoanut Row, Hibiscus, Brazilian, Australian & Chilean.
Sidewalk repairs on Peruvian, Chilean & Australian.
PHASE 5 SOUTH
Horizontal Directional Drilling / Undergrounding
Awaiting switching orders. Miscellaneous cable installation on Cocoanut Row, Hibiscus, Brazilian, Australian, Chilean and Royal Palm Way.
Sidewalk repairs on Peruvian, Chilean & Australian.
PHASE 6 SOUTH
Horizontal Directional Drilling / Undergrounding
HDD Barton Alleyways between S. Lake Trail to South Ocean Boulevard.
HDD services on Seabreeze Avenue, Cocoanut Row, Barton Ave. Via Sunny and Primavera Avenue.
HDD mainline on Seabreeze Avenue
“LOCAL TRAFFIC ONLY”