Traffic Impacts for the Week of 12/09/2024 for the Phase 5 North, Phase 6 North, Phase 7 North, Phase 3 South, Phase 4 South, Phase 5 South, and Phase 6 South Projects
PHASE 5 NORTH
Horizontal Directional Drilling / Undergrounding
No work scheduled
PHASE 6 NORTH
Horizontal Directional Drilling / Undergrounding
Private Side Conversions – Various Locations – No Traffic Impacts – Traffic Maintained.
PHASE 7 NORTH
Horizontal Directional Drilling / Undergrounding
HDD – Laurian Lane – North Ocean To Northlake Way – “Road Closed” Local Traffic Only – Traffic Maintained
HDD – North Ocean Between Garden & Via Marila – Lane Closure To Be Implemented – Traffic Maintained
Equipment & Conduit Installation – North Ocean Between Garden & Via Marila – Lane Closure To Be Implemented – Traffic Maintained
Equipment & Conduit Installation – North Alley Between Northlake Way & North Ocean – “Road Closed”
Wire Pulling (Primary) – Via Marilia Between Northlake Way & North Ocean Blvd. – “Road Closed” Local Traffic Only – Traffic Maintained”
PHASE 2 SOUTH
Changing Out Of Handhole Lids – Various Locations – No Traffic Impacts
PHASE 3 SOUTH
Horizontal Directional Drilling / Undergrounding
Continue Misc. Concrete Work – Bollard Installation – Punch List Items – Throughout The Phase
PHASE 4 SOUTH
Horizontal Directional Drilling / Undergrounding
Complete Switching Orders – Various Locations As Released By FPL
Continue Misc. Concrete Work – Bollard Installation – Punch List Items – No Traffic Impacts – Back Lot Areas
Complete Make Up & termination Work Throughout The Phase
Street Light Controllers / Service Points (2 Locations)
PHASE 5 SOUTH
Horizontal Directional Drilling / Undergrounding
Complete Misc. Punch List Items Throughout The Phase
PHASE 6 SOUTH
Horizontal Directional Drilling / Undergrounding
Cable Pulling – Only Locations That Do Not Impact North / South Roads
Equipment Installation Throughout the Phase – Only Locations That Do Not Impact North / South Roads
“LOCAL TRAFFIC ONLY”