Traffic Impacts for the week of 9/19/2022 for the Phase 4 North, Phase 5 North, Phase 2 South, Phase 3 South, Phase 4 South, Phase 5 South, and Australian Avenue Watermain Projects
PHASE 4 NORTH
Horizontal Directional Drilling / Undergrounding
FPL Feeder Energization – Various Locations – Lane Closure — Traffic Maintained
**DEPENDENT OF FPL ORDERS**
PHASE 5 NORTH
Horizontal Directional Drilling / Undergrounding
HDD — Plantation Road / Crest Road from Northlake Way to the dead end. – “Road Closed Local Traffic Only” – Traffic Maintained.
HDD — Plantation Road – From Northlake Way to North County Road – “Road Closed Local Traffic Only” – Traffic Maintained
HDD — Via Linda – (East End) – “Road Closed Local Traffic Only” – Traffic Maintained
Conduit Connections & Equipment Setting – Slope Trail Between Ridgeview & Country Club Road- Traffic Maintained
VIA LINDA / NORTHLAKE WAY DRAINAGE
DRAINAGE IMPROVEMENTS — East Side of Via Linda Closed at Northlake Way. No Turning onto Via Linda from NLW. Northbound Lane of Northlake Way – Lane Closure as Necessary to Pour Curb – Traffic Maintained
PHASE 2 SOUTH
Horizontal Directional Drilling / Undergrounding
Miscellaneous Feeder Energized in The Projects Limits Depending on FPL Orders Being Released.
PHASE 3 SOUTH
Horizontal Directional Drilling / Undergrounding
Road restorations on South County Road from El Brillo Way south to El Vedado Road and on El Brillo Way.
Miscellaneous cable installation throughout the phase.
PHASE 4 SOUTH
Horizontal Directional Drilling / Undergrounding
HDD on Chilean Avenue between South County Road and South Ocean Boulevard.
HDD services in the 100 block of Peruvian Avenue.
Conduit connections, equipment installation, and road restorations on Peruvian Avenue between Cocoanut Row and Hibiscus Avenue.
PHASE 5 SOUTH
Horizontal Directional Drilling / Undergrounding
HDD on Seaview Avenue between South County Road and the intracoastal.
HDD on Cocoanut Row between Seaview Avenue and Brazilian Avenue.
HDD on Australian Avenue between South Lake Drive and Cocoanut Row.
HDD on Seaspray Avenue between Cocoanut Row and the intracoastal.
AUSTRALIAN AVENUE WATER MAIN
WATER MAIN INSTALLATION
Australian Avenue — Local Traffic Only- One lane of traffic maintained – NO ON STREET PARKING. Cocoanut Row to Hibiscus.
Australian Avenue — Local Traffic Only- One lane of traffic maintained – NO ON STREET PARKING. Hibiscus Ave to S. County Road.
“LOCAL TRAFFIC ONLY”.
**All Phases Subject to Change**